This guide explains how refrigeration loads behave during an outage, how to decide what the generator must carry, and how to keep the system ready through regular testing. It is aimed at warehouse owners, facility managers and engineers planning a new installation or replacing an old set.
How a cold store uses power
The largest loads are the refrigeration compressors, followed by evaporator fans in the cold rooms, condenser fans outside and the pumps on any glycol or ammonia circuit. Around them sit door heaters, frost heaters under freezer floors, dock levellers, battery chargers for forklifts, lighting and the control system.
Compressors cycle on and off or vary speed with the heat load, so demand changes through the day. It peaks in hot weather and when trucks are loading, because doors are open and warm air enters. Those peaks, not the night-time average, are the starting point for any generator study.
Thermal hold time decides what must run
A well insulated freezer room full of frozen product warms slowly when the refrigeration stops. A chilled room with fresh produce, or a half-empty room with doors opening, warms much faster. The time each room can hold its temperature without cooling tells you how quickly the generator must pick up which load.
Ask the refrigeration contractor for an estimate of hold time per room under worst-case conditions. Rooms with a short hold time go into the first load block; others can follow once the set is stable. Our post on ranking loads for emergency power describes how to build that list.
Compressor starting and restart sequencing
Refrigeration compressors, especially large screw or reciprocating machines started direct on line, draw several times their running current at start. If all of them restart together when the generator comes on, the voltage dip can trip contactors or stall the set. Drives and soft starters help, but a timed restart sequence is still needed.
The control system should bring compressors back one at a time with a short delay between each, starting with the rooms that have the shortest hold time. This allows a smaller generator than one sized for all compressors starting at once, and it reduces mechanical stress on the refrigeration plant.
Sizing the generator
Build a load table with the running kilowatts and the starting kVA of each item that will be on emergency supply. Add the compressors in their restart order, then the fans, heaters and controls. The generator must carry the running total with a margin and accept the largest single start without an unacceptable voltage or frequency dip.
Whether to back up the whole site or only the refrigeration and essentials is a business choice. Backing up dock equipment and chargers lets the warehouse keep shipping during a long outage; leaving them off reduces generator size. Our kW, kVA and amps chart helps convert motor ratings into the figures a generator supplier needs.
Fuel and runtime
Outages caused by storms or grid faults can last days. The fuel tank should cover the longest outage the business wants to ride through without a delivery, at the expected average load. As a rough rule, a diesel set burns somewhere near a quarter of a litre for every kilowatt-hour it produces at moderate to high load, so the arithmetic for tank size is simple once the load is known.
Agree a priority delivery arrangement with a fuel supplier and keep the stored diesel in good condition by sampling and filtering it. A large tank that is never used for months needs the same care as the generator itself.
Transfer switching and controls
An automatic transfer switch detects the loss of mains, starts the set and transfers the emergency load once voltage and frequency are stable. For a cold store, the transfer should be followed by the compressor restart sequence, not by all loads at once. The refrigeration controller and the generator controller must share signals so this happens reliably.
Return to mains should also be managed. A closed transition or a short, controlled break prevents a second burst of compressor starts. Alarms for generator faults, low fuel and high room temperature should reach staff on duty and, ideally, a remote monitoring service.
Replacing an old set at a working cold store
Many cold stores already have a generator that was sized years ago, before extra rooms, blast freezers or a larger dock were added. Before replacing it, measure the real load over a few weeks with a power logger and compare it with the original design. The result often shows that the old set is close to its limit in summer.
Swapping a generator at a site that must stay cold needs a plan for the changeover days, with the refrigeration contractor on standby and the work timed for cooler weather. Where the existing engine is sound but the controls or alternator are dated, refurbishing the existing set can be a sensible alternative to a full replacement.
Testing and records
A generator that has not been tested under load may not perform when needed. Monthly runs with the real refrigeration load, or with a load bank when the site cannot transfer, confirm that the set starts, picks up load and runs at temperature. An annual longer test checks cooling and fuel systems under sustained demand.
Keep a log of each test, the load carried, any alarms and the actions taken. Food safety auditors and insurers increasingly ask for that evidence. Our post on test records that satisfy auditors lists the fields worth recording.
About the authors
This guide comes from the USP&E standby power engineering team. USP&E is an EPC and O&M contractor, not a broker, with 150+ power projects in 45+ countries, 25,000 MW contracted since 2002 and 24+ years in the field. Ongoing care of emergency sets is covered on our operations and maintenance page.
Offices: Colorado Springs (1755 Telstar Dr, Suite 300), Knoxville (800 S Gay St, Suite 700), London (162-168 Regent Street), Johannesburg (22 Kildoon Rd, Bryanston), Cape Town (31 Brickfield Road, Woodstock) and China (No. 1 Ningzhou Road, Wuxi). Regions: USA | AFRICA | UK | UAE | CHINA. ISO 9001 and ISO 45001 certified.
Cold storage generator questions
What size generator does a cold storage warehouse need?
It depends on the refrigeration plant. Add the running load of compressors, fans and essentials, then check that the set can accept the largest compressor start without an excessive voltage dip.
Should all compressors restart at once after an outage?
No. A timed sequence that restarts compressors one by one, starting with rooms that warm fastest, allows a smaller generator and protects the refrigeration plant.
How long can a freezer room hold temperature without power?
A full, well sealed freezer room can hold for hours, while chilled rooms with frequent door openings warm much faster. The refrigeration contractor should estimate hold time per room.
How much fuel should a cold store keep for its generator?
Enough to run the emergency load for the longest outage the business wants to cover without a delivery, plus a reserve, with a priority supply agreement in place.
How often should a cold store generator be tested?
Monthly under real or load bank load, with a longer annual test, and each run recorded with the load carried and any alarms.
Plan backup power for your cold store
Send the refrigeration schedule, compressor ratings and the outage you want to cover, and our engineers will prepare a load table and recommend a generator size and restart sequence.
Phone +27 10 822 2324 during office hours, or write to info@uspeglobal.com at any time; the standby power enquiry page also routes straight to our project engineers. Standby sets suited to refrigeration loads can be found in our diesel generator stock list.