This guide explains how emergency generators for nursing homes, assisted living and other long-term care facilities are planned. It covers the code framework, the loads that need support, how to size the generator and fuel, and the testing and staff readiness that make the system dependable when it is needed.
Why long-term care needs its own approach
Hospitals have long had detailed rules for emergency power, and our page on hospital standby diesel design covers that setting. Long-term care facilities share some of the same needs but differ in important ways. They usually have fewer medical systems than a hospital but house residents for months or years, so comfort and temperature control are part of keeping people safe, not extras.
Evacuation is also harder. Moving frail residents carries its own risks, and nearby facilities may be affected by the same event. A generator that can keep the building habitable for several days is often the safest plan.
The code framework
In the United States, many long-term care facilities fall under NFPA 99 for health care electrical systems, NFPA 101 for life safety and NFPA 110 for the generator installation itself, as adopted by the authority having jurisdiction. Facilities in federal health programmes also follow emergency preparedness rules that require an alternate power source to support temperature control, emergency lighting, fire detection and similar essential needs.
Requirements depend on the type of care, the occupancy classification and local amendments, and some states add their own rules on generator capacity or on-site fuel. The first step in any project is to confirm with the local authority which editions and amendments apply. Our page on NFPA and life safety framing gives broader background.
Essential loads to support
Under the essential electrical system approach, loads are divided into branches. The life safety branch covers egress lighting, exit signs, fire alarm and certain communications. Critical loads cover areas and equipment used for resident care, such as nurse call, medication preparation and outlets serving medical devices. Equipment loads include heating, ventilation, elevators and other building systems.
Beyond code minimums, owners should consider kitchen equipment, refrigeration for food and medicines, laundry, water pumps, electric door locks and the IT systems that hold resident records. Oxygen concentrators deserve special attention because they draw significant power and residents cannot go without them. A clear load list, ranked as described on our load priority planning page, keeps the design focused.
Temperature control is a safety load
Older adults regulate body temperature less effectively, and many medications affect heat tolerance. Indoor temperatures that would be uncomfortable for staff can be dangerous for residents within a day. For this reason, cooling and heating should be on the generator in most climates, at least for resident rooms and common areas used as refuge spaces.
Where powering the whole HVAC plant is too large, designating a cooled or heated refuge area served by the generator is a practical option. That area needs enough space, seating, toilets and medical outlets to hold residents for the duration of an outage. Staff should practise moving residents there, because doing it for the first time during a real event takes far longer than expected.
Sizing: a worked illustration
Consider a 120-bed facility. As an illustration only, life safety and critical loads might total around 60 kW, kitchen and refrigeration around 50 kW, elevators 30 kW, and cooling for resident wings and refuge areas around 180 kW. Adding pumps, IT and miscellaneous loads of about 30 kW brings the running total to roughly 350 kW.
Motor starting, particularly for chillers, compressors and elevators, often sets the generator size rather than running load. With starting studies, a margin for future loads and the site altitude and temperature, a set in the range of 500 to 600 kVA might result. Each facility needs its own calculation; the kW, kVA and amps sizing chart helps with the conversions.
Fuel, transfer and installation
Fuel storage should cover the outage duration the owner plans for, not just the code minimum. Large storms can block fuel deliveries for several days, so many facilities keep enough diesel for 72 to 96 hours at expected load, with a resupply contract in place. Fuel quality management keeps stored diesel usable.
Automatic transfer switches for life safety and critical loads must transfer within the time set by code, commonly 10 seconds under NFPA 110 Level 1. The generator should be installed above flood level, in a weather-rated enclosure or room, with exhaust kept away from windows, air intakes and outdoor resident areas. Our installation guide covers the steps.
Testing and staff readiness
Generators at care facilities are normally exercised monthly under load and given longer load tests at intervals set by code, with every test recorded. Transfer switch operation should be tested as part of the same routine. Inspectors look closely at records, so a clean log matters as much as a working machine.
Staff need to know what the generator covers and what it does not. Labelled outlets for medical devices, a written outage plan, drills that include night shifts and a contact list for fuel and service support make the difference between a calm outage and a chaotic one. Maintenance contracts that guarantee response times, as part of a wider operations and maintenance programme, close the loop.
About the authors
This guide comes from the USP&E life-safety standby generation specialists. USP&E is an EPC and O&M contractor, not a broker, with 150+ power projects in 45+ countries, 25,000 MW contracted since 2002 and 24+ years in the field. For larger sites that combine standby and continuous power, see our hybrid power systems page.
Offices: Colorado Springs (1755 Telstar Dr, Suite 300), Knoxville (800 S Gay St, Suite 700), London (162-168 Regent Street), Johannesburg (22 Kildoon Rd, Bryanston), Cape Town (31 Brickfield Road, Woodstock) and China (No. 1 Ningzhou Road, Wuxi). Regions: USA | AFRICA | UK | UAE | CHINA. ISO 9001 and ISO 45001 certified.
Nursing home generator questions
Are nursing homes required to have emergency generators?
Most long-term care facilities need an emergency power source under the codes adopted locally and emergency preparedness rules. Requirements vary by care type and jurisdiction.
What should a nursing home generator power?
Life safety systems, resident care areas, medical device outlets, oxygen concentrators, heating or cooling for resident areas, kitchens, refrigeration and essential building systems.
Should air conditioning be on the generator?
In most climates, yes, at least for resident rooms or a designated refuge area, because residents are highly vulnerable to heat.
How long should fuel last?
Enough for the planned outage duration at expected load. Many facilities plan for 72 to 96 hours with a resupply contract.
How fast must the generator take the load?
Life safety and critical loads commonly must transfer within 10 seconds under NFPA 110 Level 1, subject to local adoption.
How often should the generator be tested?
Typically monthly under load, with longer load tests at intervals set by code and every test recorded.
Plan care facility emergency power
Send the floor plans, bed count and essential load list, and our engineers will propose a generator, transfer and fuel arrangement for your facility.
Phone +27 10 822 2324 during office hours, or write to info@uspeglobal.com at any time; the emergency generator enquiry page also routes straight to our project engineers. Standby rated sets are listed in our diesel generator stock.